projects

Turnkey Projects

Installation of storage tanks, pressure vessels and pipe lines for petroleum products as in fuels ( LNG , LPG, CNG, MS, HSD (Diesel), SKO (Kerosene), LSHS, Naphtha, FO (Furnace Oil), solvents (MTO (Turpentine), SBP, Hexane) speciality products such as BENZENE, TOLUENE, CRMB (Crumb Rubber Modified Bitumen), PMB (Polymer Modified Bitumen).

    1. Erection of Pressure Vessels (Bulk LPG)


    projectdiesel
    projecterectionoflpgbullets

    Site Inspection, designing and preparation of drawing as per rules stipulated by Petroleum and Explosives Safety Organization (PESO), also obtaining clearance / permission from Controller of Explosives C- COE & NOC from local administration. Providing site clearance, foundation (RCC &PCC) and other civil work, for the installation, also providing pipe line with X - ray quality welded joints along with pumps, valves, gauges with all safety gadgets. Multi stage regulator with vaporizer unit for trouble frees dispensing or bottling of the product as required by end user along with necessary Fire Hydrant and Leak Detection Systems.

    2. Commissioning of Gas Bank & Piped Gas (LPG & CNG)(LOT & VOT)


    detector.jpg
    projectpic2
    project-COMMISSIONINGOFGASBUNKERS

    Design of manifold as per ISO guide lines with facilities of change over including the shut off valve, LOT & VOT (Liquid off Take & Vaporized off Take) delivery system with multi stage pressure regulation for residential, commercial and industrial use. Commissioning of the header, riser and feeder with schedule pipes and fixtures with quality certified welded joints, along with valves, unions, couplings, and flow meter integrated with BMS (Building Management System). Providing addressable Leak Detection Systems along with sensors, controllers and hooters with with Fire Hydrant in line

    3. Installation of Petroleum Storage Tanks (HSD,LSHS,FO, LDO,SKO,MS)


    project-projecttanksinstallation

    Site inspection and preparation of drawings as per the Petroleum Explosives Safety Organization (PESO) guidelines and obtaining initial approval from the local authorities as in state and central government agencies. Site clearance, excavation, foundation,(RCC & PCC) for the installation of underground product tank including pressure testing, laying of pipe line with flow meter, valves and other safety gadgets connecting the main tank to the service tanks. Issue of license from Controller of Explosives(C-COE) for storage and transfer of the product, and commissioning of the tank including calibration.

Toto Slot Dana
Kacabet Slot Gacor
FUJI88 Slot Online Dana
FUJI188 Via Dana Login
Daftar Akun Dana FUJI77
Bandar Judi Online Terlengkap
KACABET Dana Slot Login
Daftar FUJI188 Via Dana
FUJI188 Slot Gacor Deposit Dana
Blogger Slot Dana
Situs Slot Dana Online Terpercaya
Slot Deposit Dana 5000
Akun Slot Dana Pro
Slot777 Login
Toto Slot Resmi
Gaming 77 Slot Online
Skytoto Link Daftar
Gaming Toto Slot Online
BENTO88
Togel Online
Togel Online
Poltekked Medan
Logbook online
Game Poltekkes Mahasiswa
Bandar Togel Online Terpercaya
Slot Demo Online Terbaik
Situs Aplikasi Slot Online Terbaik
DUNIAW | Best's Blogger Indonesia
WikiGame Forum Post
Situs Slot Online Terpercaya
Permainan Slot Toto Online
Slot Toto Online Terbaik
Agen Slot Casino Online
Slot Online Gacor Hari Ini
Togel Online Terbaik
Bandar Toto Togel Paling Murah
Toto Togel Online Terbaik
Situs Slot Dana
Bintang88
FUJI188 Situs Slot Online Gacor Terpercaya

Sensasional88 Slot Gacor
Slot Gacor Hari Ini